Logo
Question DetailsNormal
$ 15.00
Machine A can perform 3 tasks in 5 seconds | Complete Solution
Question posted by
request

1.Machine A can perform 3 tasks in 5 seconds. Machine B can perform 2 tasks in 4 seconds. Which machine can perform  a task faster?  How much faster is this machine than the other?

2.Suppose the clock period is 400 picoseconds. What is the clock rate in gigahertz (GHz)?

3.The portion of time a program spends performing floating-point operations is 30%. A new floating-point co-processor would perform floating-point operations five times as fast. Given that the execution time of a program required 50 seconds without the new floating-point co-processor, what would you expect the execution time of the program to be in seconds with the new floating-point co-processor?

4.Given that a program on a machine requires an average of 4 cycles per instruction, the machine has a 2 GHz clock rate, and the program executes a total of 50,000,000,000 instructions, what is the CPU time in the seconds required by this program ?

5.Consider a computer system, where each processor can independently perform a separate task. Given that the response time on a computer system for a single task is 8 seconds, how long would it take to perform 10 tasks on this system when it has four processors ? What would be the throughput per second for 10 tasks?

Available Solution
$ 15.00
Machine A can perform 3 tasks in 5 seconds | Complete Solution
  • This solution has not purchased yet.
  • Submitted On 21 Jan, 2015 12:15:19
Solution posted by
solution
Time taken by machine A do 1 task : 5/3 secsTime taken by machine B to do 1 task : 4/2 secsPerformance = 1/execution TimePerformance of A = 3/5 = 0.6 Performance of B = ½ = 0.5Machine A can perform faster by 0.6/...
Buy now to view full solution.
closebutton

$ 629.35